Gasfin offers right-sized LNG production infrastructure with production capacities ranging from 0.4 mtpa to approximately 1.5 mtpa, ideally suited to monetise stranded gas or access mid-scale markets with right-sized production.
Gasfin developed and permitted Caribbean LNG, a 0.5 - 1.0 mtpa liquefaction plant that was proposed in Trinidad and Tobago.
Gasfin LNG production infrastructure offers the following advantages:
LNG production costs equivalent to world scale plants on a per unit basis
Designed and engineered in-house by Gasfin and its affiliates ensuring that technical, operational and commercial aspects are considered holistically
Whether pipeline quality or raw gas from a stranded field, Gasfin together with TGE can engineer the appropriate gas processing system
Use only proven technology and partners that have been successfully applied on previous Gasfin and TGE projects.
Manage interface between mid-scale LNG production and global LNG market
Suitable for barge mounted (near shore FLNG) or onshore implementation
Gasfin can provide FLNG units with the following specifications:
LNG production solution for: 0.25 - 1.5 mtpa delivered to EU classification
Barge storage of 20,000 - 50,000 m³ complemented by FSU storage of 125,000 m³ +
Integrated gas processing and heavy hydrocarbon storage and send out
Suitable for jetty or spread mooring in near shore benign marine conditions
Fully managed delivery through FEED (6 - 8 months), then construction, installation, commissioning (~ 36 months)